About Company - Ñompany - Dneprospetsstal
Óêðà¿íñüêà âåðñ³ÿÐóññêàÿ âåðñèÿEnglish versionSearchSitemap
About Company - Ñompany - Dneprospetsstal
ÑompanySocial ResponsibilitySalesPurchasePress Centre
Steel Production and Production Fasilities
Quality and Certification
Financial Statements
Contact

About Company

PrJSC “Dniprospetsstal” is a key manufacturer of special stainless steels in the CIS market and an undisputed Ukrainian leader in this market segment.

Dniprospetsstal, as the largest international company, develops, manufactures and sells metal products of stainless, tool, high-speed (including those produced by the PM-method), bearing, structural, alloyed and carbon steel grades.

The technologies applied at DSS enable to produce high-quality materials used in a variety of industries, i.e. engineering, shipbuilding, automotive, aerospace, power generation, oil and gas, heavy equipment manufacturing.

Our metal is used to produce parts for vehicles and machinery, seamless tubes and bearings, tools for further processing of metals and alloys.

The geographical location of the company provides a significant advantage in entering the markets of the CIS and the EU. The products of Dniprospetsstal are in demand in more than 60 countries. Maintaining its leading position in the national market, DSS expands its presence in the CIS, Europe, America and Asia, working with partners and distributors in 15 countries.

The quality management system of PrJSC "DNIPROSPETSSTAL" is certified for compliance with the international standard ISO 9001: 2015 by the certification body TÜV Thüringen eV (Germany), the official representative of which in Ukraine is TÜV Thüringen Ukraine.

History of Dniprospetsstal

Each year, since the date of DSS foundation, has been marked with the events significant not only for PJSC “Dniprospetsstal”, but for the whole metallurgical industry as well.

1932 the first heat – DSS Foundation Day

1933 bearing steel production was set up

1934 production of stainless acid-resisting chromium-nickel steel was mastered

1941 the works evacuation to Siberia in a period of the World War II

1945-53 the works’ performance restoration after the World War II

1948 the first post-war heat

1955 ladle degassing was practised for the first time ever in the USSR

1956 heat-resistant alloys production was set up

1957 cold-drawn steel production was mastered

1958 electric-slag remelting process was set up for the first time ever in the world

1959 steel and alloy melting in the vacuum-arc furnaces was mastered for the first time ever in the USSR

1966 the biggest in Europe, at that time, specialized shop for ESR and VAR ingots melting was built

1972 manufacture of large capacity forgings in the forge-press shop was mastered

1980 manufacture of tool and high-speed steel using PM-method was mastered for the first time in the USSR

1987 gas-oxygen refining process was implemented for the first time in the USSR

1996 Danieli ladle-furnace was put into operation, and a modern technology of structural and bearing steel manufacture was set up using this Italian unit

1996 quality system according to ISO 9002:1994 was implemented and certified

1998 Mannesmann-Demag vacuum degasser was put into operation, and a Secondary metallurgy technology was set up using this German equipment

2002 metal surface finishing shop was put into operation

2002 quality system according to ISO 9001:2000 was implemented and certified

2003 ladle-furnace was put into operation in the Steel melting shop No.2, and resource saving technology of corrosion-resistant steel production was implemented using this unit

2006 drop-hammer plant was equipped with a scrap shear press unit

2007 slag processing shop was built

2008 quality system according to ISO 9001:2008 was implemented and certified

2009 Loeser RPS 377 line for 120-280 rolled stock finishing was put into operation at the finishing roll line area of the rolling mill

2012 CVS Makina’s 1200 thousand cubic meters/hour Gas Treatment Station was put into operation in the Steel melting shop No.3

2012 ferromolybdenum manufacture area was put into operation in the Steel melting shop No.2

2015 the oxygen storage facility of PJSC "Linde Gas Ukraine" was built

2017 certification of the quality management system (QMS) for compliance with the risk-oriented international standard ISO 9001: 2015.

2020 successful re-certification of the quality management system (QMS) and confirmation of compliance with ISO 9001:2015

Printing versionPrinting version